Contact us:
Headquarters address:
Flat 1201, 12/F, Empress Plaza,
17-19 Chatham Road South, Tsim Sha Tsui, Kowloon.

Injection molding factory two

Injection molding factory two

Injection molding factory

water treatment
I. Purpose of Water Quality Treatment Project
II. Benefit Objectives of Synergy System Installation
III.Installation of Synergy Circulating Water Treatment System
IV.Photo Comparison Before and After Synergy Circulating Water Treatment Installation
V. System Drainage

I. Purpose of Water Quality Treatment Project

Remove scale from cooling system and cooler

II. Benefit Objectives of Synergy System Installation

  1. Remove accumulated scale;
  2.  Prevent new scale from forming;
  3.  Extend equipment life;
  4.  Reduce maintenance costs.

III. Installation of Synergy Circulating Water Treatment System

SE500 system set

IV. Photo Comparison Before and After Synergy Circulating Water Treatment Installation

1. Cooling tower-heat sink

(before installation)

35

(after installation)

2. Cooling tower – water pan

37

(before installation)

(after installation)

3. Injection molding machine-cooler

Before installation

After installation

V. System Drainage

44
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare