Contact us:
Headquarters address:
Flat 1201, 12/F, Empress Plaza,
17-19 Chatham Road South, Tsim Sha Tsui, Kowloon.

Injection molding factory

Injection molding factory

Injection molding factory

water treatment
I. Project Overview
II. Synergy Physical Descaling System Installation
III. Comparison Photos of Cooler Before and After Water Treatment
IV. Water Quality Analysis

I. Project Overview

Injection molding machine cooling system:

     i) Small central refrigeration unit
    ii) Cooling water tower – 5 cooling water towers, about 700 cooling tons

Central air conditioning cooling system:

              3 cooling water towers with approximately 140 cooling tons

II. Synergy Physical Descaling System Installation

WTS20 two groups

III. Comparison Photos of Cooler Before and After Water Treatment

Before installation–

After installation –

14

IV. Water Quality Analysis

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare